Contaminated groundwater should be modeled for contaminate concentration degradation prior to initiating design or treatment systems. Barrier wall construction, coupled with additional source removal, can significantly reduce the presence of contaminants in groundwater over time.
As part of the national pollutant discharge elimination system (NPDES), Eisenbach & Ruhnke Engineering, P.C. personnel monitor stormwater from all industries classified as requiring stormwater analysis. We conducts monitoring, evaluates results, and makes recommendations for cost-effective treatments and solutions.
Whether the project is wastewater treatment, Bioremediation or the latest developments in Phyto-remediation, Eisenbach & Ruhnke Engineering, P.C. has saved companies thousands of dollars by conducting treatability studies.
Eisenbach & Ruhnke Engineering, P.C. personnel are experts in wastewater treatment. Routine designs include municipal sewage, metals finishing wastewaters, textile manufacturing wastewaters, and other hydrocarbon manufacturing process wastewaters.

| Home Page
| About Us| Our Services| Employment| Meet the Team| Contact Us
| FTP Files |
Copyright © 2010, Eisenbach and Ruhnke. All rights reserved.